Ariel Plastics · Website previewAbout this prototype

Useful starting points

Innoline Corotherm multiwall Vistalux Technical documents

Dry fix roofing / Product information

Dry Fix Roll out Tray

This dry fix solution eliminates the need to carry mortar to the top of the roof making ridge installation with the complete Universal Dry Ridge System easier, quicker and safer.

  • Easy to install
  • Maintenance free
  • Smooth line finish
Plan a project with this product
Dry Fix Roll out Tray
Dry Fix Roll out Tray · published Ariel image

Published product information

Detail & guidance

Easy to install

Maintenance free

Smooth line finish

ideal for

DIY roofing projects

Full installation details are available on request from the Technical Department.

Simple Installation

Fix one bracket at each rafter. Bend lower legs of bracket to suit chosen ridge tile, allowing stainless steel fixing screw (see stage 7) to penetrate ridge batten at a minimum of 20mm. Correct bending position is best found by temporarily placing top tile batten and a few roof and ridge tiles and eyeing up bracket position beneath ridge tile. Subsequent brackets should be bent identically to the first.

Push ridge batten (min 25mm x 50mm) firmly onto location spikes. Caution: Do not use a hammer - push batten only!

When ridge batten is in place, bend bracket upper legs over and fix through holes with nails provided. Caution: Take care not to further bend bracket lower legs when fixing! Proceed to lay top row of roof tiles.

Unroll ridge-roll and fix with nail at 1-2m centres. Peel backing from mastic strips and press firmly onto tile, checking for good adhesion. Do not attempt fixing if tile is wet or temperature is below 5°c. If ridge is longer than 6m, overlap rolls by a minimum of 75mm and place a nail in the of the lap.

Pre-bend union to match ridge tile. Assemble cap to union and push onto ridge tile. Cap & Union assembly should grip ridge tile without deformation to cap. Only if needed i.e. triangular ridge tiles, cap arms can be bent at bend point indicated. Caution: Bend once only. Repeated bending can overstress the component and lead to premature failure!

Push next ridge tile firmly into place, trapping it between the cap and the union.

Fix through hole in centre of cap using 75mm stainless steel screws provided. Caution: Do not use nails! Screw should be tightened so that ridge tiles do not lift. Cap should not deform more than 3mm from its original shape. Note: If at this point it is discovered that the brackets were not set high enough at stage 1, another batten can be screw fixed on top of the original to achieve correct engagement. Ensure additional batten does not block vent holes in ridge roll.

Click side arms into place. Ridge roll should overlap at edge of gable end by approx. 50mm when using a dry verge or black end ridge tile. When using a bedded verge, stop ridge roll 50mm short from edge of gable end. Ridge tiles at end of ridge must be full tiles, do not cut down.

Supporting resources

Documents for this range

Linked in the published catalogue

Related products & components

Universal Dry Hip System

Dry fix roofing

Universal Dry Ridge System

The Corovent URS Universal Ridge System provides a unique jointing system which can be used with both half round and angled ridges. Mortar free, it is the fastest way to install…

View product
Dry Fix Union

Dry fix roofing

Dry Fix Union

The Corovent URS Dry Fix Union is designed to accompany the Ariel Plastics Universal Dry Ridge System and comes with fixings included.

View product

Range & components

Vistalux PVC Sheet & Accessories

Vistalux corrugated sheeting is the ideal general purpose PVC sheet for roofing and cladding. Economic, lightweight and easy to install, Vistalux PVC is a versatile corrugated r…

Explore range

Range & components

Corrugated Polycarbonate Sheet

Polycarbonate is an outstanding rooflight material which provides superior strength and resilience in challenging conditions. It provides a UV protected, weatherable and longer …

Explore range

Product & project support

A question about Dry Fix Roll out Tray?

Keep this product context with your enquiry and let Ariel confirm the next step.

Enquire about this product
Source & review information

Content imported from Ariel’s published product information, captured 27 October 2026. Final technical/content approval is pending; current stock, delivery and warranty assurances are not asserted. Source reference (opens a new tab) ↗